Home SAP WM Training
SAP WM Online Training PDF Print E-mail

 

Course Duration: 35 hrs
Timing

Week Days: 2 hrs per day (0r) Weekends : 3 hrs per day

Method: Online, Instructor led, with exercises.
Breaks: As Required, but limited to total of 5 min. in a day.
Online

$ 550

Study Material

Included

System Access 60 days (from day-1 of the course.)

 

*Warehouse Structure in the Warehouse Management System

Warehouse Number

Storage Type

Storage Section

Picking Area

Storage Bin

Quant

Staging Area

 

*Basic Stock Management

*Material Master Data

Defining Warehouse Data in the Material Master

Displaying the Material Master Record

 

*The Quant and Stock Management in WM

Changing Quant Data

Displaying Quant Information

 

*Batch Management

*WM Interface to Inventory Management (IM)

Interim Storage Bins

Creating Interim Bins with Predefined Coordinates

Order of Postings in Integrated WM

Posting First in IM

Posting First in WM

Comparing Stock Quantities in WM and IM

 

*Movement Types in WM

Using Special Movement Indicators

 

*Transfer Requirement

Creating Transfer Requirements

Creating Transfer Requirements

Processing Transfer Requirements

 

*Transfer Order

Creating Transfer Orders

Automatic Creation of TOs for Transfer Requirement

Using a Transfer Order as a Pick Order in Lean WM

Displaying Transfer Orders

Print Transfer Orders and Labels

Printing Transfer Orders and Labels

Evaluating Transfer Orders

Confirming Transfer Orders

Confirming Transfer Orders

 

*Goods Receipt

Creating Transfer Orders Immediately at the IM Posting

Manual Creation of Transfer Orders for Putaway

Posting a Goods Receipt Based on a Purchase Order

Goods Receipt Without a Previous Posting in IM

 

*Stock Placement Using Storage Unit Types

Example: Using Storage Unit Types

Setting up Active Bypass for Putaway

 

*Adding Goods to Existing Stock

*Goods Issue

*Goods Issues Based Upon a Delivery

Random Picking Using Transfer Orders

Pick-and-Pack During Picking

Picking from a Fixed Bin without a Transfer Order

Picking Quantities Based on Size

Goods Issue for a Delivery

Creating a Delivery

Automatic Creation of Transfer Orders for Outbound Delivery.

Confirming a Transfer Order for a Delivery

Processing Differences for a Delivery

Partial Picking

Creating a TO for a Cancelled Delivery

 

*Goods Issue Based on an IM Posting

Goods Issue to a Cost Center

Posting a Goods Issue to a Cost Center

Creating a Transfer Order for a Material Document

 

*Manual Creation of Transfer Orders for Picking

*Goods Issue for Production Supply

Pick Part

Crate Part

Release Order Part

Setting up the Interface between PP and WM.

Production Supply Areas

Creating a Control Cycle

Production Storage Bins

The Material Staging Process

Creating a Production Order

Displaying a Production Order

Releasing a Production Order

Automatic Staging for WM

Displaying TRs for Material Staging

Creating TRs for Material Staging Manually

Processing TRs for Material Staging

Posting a Goods Issue for Material Usage

Kanban Replenishment

Handling Cancelled Kanbans

Material Staging for Repetitive Manufacturing

Staging Release Order Parts for Repetitive Manufacturing

 

*Multiple Processing

Selecting TRs for Multiple Processing

Selecting Deliveries for Multiple Processing

Sample Report: Multiple Processing Selection

Creating Transfer Orders for a Group

Releasing Groups

Confirming TOs for a Group.

Partial Processing of TRs and Deliveries

Analysis of Groups

 

*2-Step Picking

2-Step Picking Process

Work Method 1: Delivery to Goods

Work Method 2: Goods to Delivery

How to Carry Out 2-Step Picking

Using the Analysis Tool for 2-Step Picking

 

*WM Interface to Quality Management

*How the QM Interface Process Works

Making Stock Placements Using the QM Interface

Examples: Making a Usage Decision

 

*Finding an Inspection Lot in the Warehouse

*Examples for the Putaway of Inspection Stock

After Usage Decision: Sample Stored

After Usage Decision: Stock Returned to Vendor

After Usage Decision: Sample Destroyed

Before Usage Decision: Sample Stored

Before Usage Decision: Stock Returned to Vendor

Before Usage Decision: Sample Destroyed

 

*Stock Transfers and Replenishment

*Plant/Storage Location to Plant/Storage Location

*Internal Stock Transfers

Moving Stock from One Storage Bin to Another

 

*Creating a Replenishment TO During TO Confirmation

*Posting Changes in WM

*Processing Posting Changes

Displaying Posting Change Notices

Automatic Creation of TOs for Posting Change Notices

 

*Processing Posting Changes Entirely Within WM

Example: Changing the Status of Consignment Stock

 

*Processing Inspection Stock

Releasing Stock from Inspection.

Releases from More than One Storage Type

 

*Releasing Consignment Stock from Inspection

*Processing Blocked Stock

*Converting Available Stock to Inspection Stock

*Changing a Material Number

*Dividing Materials into Two or More Batches

*Changing Stock Ownership from Plant to Plant

*Storage Locations in TRs, TOs and Posting Changes

Possible Scenarios Based on Storage Locations

Example: Stock Movement from GR Area

Example: Material Staging for Production

 

*Putaway and Picking Strategies

*Putaway Strategies

Manual Entry

Strategy F: Fixed Bin Storage

Strategy C: Open Storage

Strategy I: Addition to Existing Stock

Strategy L: Next Empty Storage Bin

Strategy K: Putaway near Picking Bin

Strategy P: Storage Unit Type

Example: Optional SUT Check When Creating a TO

Strategy B: Bulk Storage

Combined Placement

Partial Quantities

Blocking Transfers into a Row

Defining Time Limits for Block

Total

Round Off

Strategy Q: Dynamic Quant Number

 

*Additional Factors that Affect Search Strategies

Cross-Line Stock Putaway.

Capacity Checking

Capacity Checking Based on a Neutral Indicator

 

*Picking Strategies

Strategy F: FIFO (First In, First Out)

Strategy: Stringent FIFO Across All Storage Types

Strategy L: LIFO (Last In First Out)

Strategy A: Partial Quantities First

Strategy M: According to Quantity

Example: Rounding Off Requested Quantities

Strategy H: Shelf Life Expiration Date

Strategy P: Fixed Storage Bin

 

*Storage Unit Management

*Putaway using Storage Unit Management

Creating Storage Units

Creating Homogeneous Storage Units

Creating Mixed Storage Units for a TR

Adding Materials to an Existing Storage Unit

Creating Storage Units Manually

Automatic Bin Search

Confirming Transfer Orders for Storage Units

Displaying the Contents of a Storage Unit

Identification Point

Using an ID Point

Example: Putaway Using an ID Point

Transferring a Storage Unit from the ID Point

 

*Stock Picking Using Storage Unit Management

Partial Stock Removals

Pick Point

Picking Using a Pick Point

Example: Returning Stock from a Pick Point

 

*SU-managed Bulk Storage

System Controls

Transfer Order Processing for Stock Removals

Confirming SU-Neutral Transfer Order Items

Partial Storage Unit Processing

Example: Optimization in Bulk Storage

 

*Storage Unit Documents

Printing SU Documents Manually

 

*Storage Unit Preplanning

Preplanning Storage Units via an ID Point

Receiving Preplanned Storage Units

Handling Differences for Preplanned Storage Units

 

*Function Modules and Customer Exits in WMS

 


 

Add comment

Thank you for posting comment on our course.


Security code
Refresh